{"id":449,"date":"2012-06-25T10:00:37","date_gmt":"2012-06-25T15:00:37","guid":{"rendered":"http:\/\/butchieboy.info\/blog\/?p=449"},"modified":"2012-06-25T10:00:37","modified_gmt":"2012-06-25T15:00:37","slug":"kitchen-remodel-4","status":"publish","type":"post","link":"https:\/\/butchieboy.info\/blog\/2012\/06\/25\/kitchen-remodel-4\/","title":{"rendered":"Kitchen Remodel \u2013 4"},"content":{"rendered":"<p>Some of you have been curious about how we are making out without a kitchen five weeks into our project.<\/p>\n<p>A few days before the demolition was scheduled to begin, we started boxing up all the things in our cupboards and drawers. We normally drain the hot tub about this time of year so we did that and put as many of the boxes\u00a0as we could fit, inside the tub. That only amounted to about half of them. We put the cover back on the tub and got a 4&#8217;x8&#8242;\u00a0sheet of plywood from my shop to put over the cover and protect it. Lastly, we got a plastic table cloth out and covered the plywood. So far so good. The last of the boxes were put on the back of the cover and anywhere else they could fit.<\/p>\n<p>We were still packing the last of the things when the demolition crew arrived but we got our part done in short order and didn&#8217;t cause them any inconvenience. The first thing we had them do was move the refrigerator into the tub room. While we were content to get rid of all the other appliances, the fridge was going to be necessary for us to prepare food during the time that things were disrupted. We are debating if we will move it to the basement once the project is complete but the jury is still out on that yet.<\/p>\n<p>We thought there would be a few ways that we could still cook conveniently. We have a nice propane camp stove, a couple of crock pots, a toaster oven, and a microwave. The sink would be a problem, but we have a small one in the adjoining powder room so as long as we keep at the washing and drying, the dishwashing shouldn&#8217;t be too bad.<\/p>\n<p>The basic configuration looked like this&#8230;<\/p>\n<p><a href=\"http:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel20W.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-450\" title=\"The basic kitchen layout\" src=\"http:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel20W.jpg\" alt=\"The basic kitchen layout\" width=\"640\" height=\"354\" srcset=\"https:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel20W.jpg 640w, https:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel20W-300x165.jpg 300w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p>Here is what our\u00a0&#8220;new&#8221; range looked like&#8230;<\/p>\n<p><a href=\"http:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel21W.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-451\" title=\"The propane stove\" src=\"http:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel21W.jpg\" alt=\"The propane stove\" width=\"640\" height=\"510\" srcset=\"https:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel21W.jpg 640w, https:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel21W-300x239.jpg 300w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p>And here is the toaster oven&#8230;<\/p>\n<p><a href=\"http:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel22W.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-452\" title=\"The toaster oven\" src=\"http:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel22W.jpg\" alt=\"The toaster oven\" width=\"640\" height=\"646\" srcset=\"https:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel22W.jpg 640w, https:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel22W-150x150.jpg 150w, https:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel22W-297x300.jpg 297w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p>The last is the food preparation area, just to the left of the propane stove. As time has gone on, we have had more and more encroachments on this space and it is getting harder and harder to use.<\/p>\n<p><a href=\"http:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel23W.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-453\" title=\"The food preparation area\" src=\"http:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel23W.jpg\" alt=\"The food preparation area\" width=\"640\" height=\"418\" srcset=\"https:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel23W.jpg 640w, https:\/\/butchieboy.info\/blog\/wp-content\/uploads\/2012\/06\/Remodel23W-300x195.jpg 300w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p>If we really wanted to make this work, we could do it of course. But sometimes we haven&#8217;t remembered to get something out of the\u00a0freezer or as suppertime arrives and we realize that we haven&#8217;t had the meal cooking in the crockpot all day. We often knuckle under and go out and\u00a0get something to eat. One week we went to two different Indian restaurants. The House of India\u00a0was more\u00a0of a formal restaurant than we had expected but their Korma was excellent. The other one was the Taj Mahal. It serves a buffet on Friday, Saturday, Sunday, and Monday nights. We like that because they have about 15 or 20 different things to try and we like most of them. If you have\u00a0to order off the menu, you either lose out on variety or you spend a fortune to get several selections.<\/p>\n<p>Oftentimes we try to cook more than a couple of servings. That way we can put the extras away for a future meal. We measure out individual portions and put them into baggies. Then we pop them into the freezer. If you want\u00a0a quick lunch, you just get one out, break it up, put it in a bowl, and 3 minutes later you are having your meal.\u00a0Easy\u00a0peasy!<\/p>\n<p>All in all we are starting to suck at this and are more than ready to have the whole thing over with.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Some of you have been curious about how we are making out without a kitchen five weeks into our project. A few days before the demolition was scheduled to begin, we started boxing up all the things in our cupboards &hellip; <a href=\"https:\/\/butchieboy.info\/blog\/2012\/06\/25\/kitchen-remodel-4\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_s2mail":"yes","footnotes":""},"categories":[6],"tags":[],"class_list":["post-449","post","type-post","status-publish","format-standard","hentry","category-daily_life"],"_links":{"self":[{"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/posts\/449","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/comments?post=449"}],"version-history":[{"count":4,"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/posts\/449\/revisions"}],"predecessor-version":[{"id":457,"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/posts\/449\/revisions\/457"}],"wp:attachment":[{"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/media?parent=449"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/categories?post=449"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/butchieboy.info\/blog\/wp-json\/wp\/v2\/tags?post=449"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}